Week 10 means we have walls! This couple of weeks has been the messiest so far. It is amazing how much dust drywall generates! The space looks so so different at this point. Since I last posted, they finished all of the rough in for the plumbing and electrical. The roofers were finally able to get here and put a permanent roof on the dormer and do all of that roof finishing. The weather had been holding us up a little bit. We had a temporary roof of plywood with a giant tarp on top of it. We had a big snowstorm come through with crazy winds and the tarp blowing sounded just like thunder for 2 days. So I am really glad that’s finished. We also have insulation. Which is incredibly important in winter in Minnesota. The whole house feels a lot warmer. There’s still a draft because the windows are all covered in plywood, but it’s an improvement.

We had a tiny bit of drama with the drywall delivery. A huge crane truck pulled up in front of the house but the operator decided that our neighbor’s mulberry tree was in the way, so he told our contractor that he was just going to “trash it”. Our contractor looked at him like he was nuts and explained that trashing the neighbor’s property just really wasn’t an option. So they drove off in a huff with all of our drywall still on the truck. They simmered down a little while later, figured out a different option and our crew carried all of those drywall sheets up the outside stairs. I am again glad that was not my job.

My favorite part of this few weeks was getting to see the real shape of the space. I told my dad (who was our architect) that I think it almost looks faceted. Because it’s an attic, there are angles everywhere. There are really only a couple of walls that go floor to ceiling uninterrupted. Most of the others are divided up by a sloped ceiling or an angle. I was considering painting some bold colors upstairs but I am now thinking that with all of those angles it might just need to be one color. I can’t wait to see how the light plays across everything once the windows are in. We finally have some of our windows about 8 months after we ordered them. Two more are still in limbo; we aren’t sure when they will be ready.

Today they’ve started to lay down the floor in the main room and the tile guy is here working on the bathroom floor to get it prepped for the tile. I’m excited to see how much lighter the space is with the maple colored floor and light creamy tile.